Another week coding the app, the nice thing is that the MVC re-write is pretty much done. In fact the idea of utilizing the DB to store information is actually in place, something I wound up having to...
View ArticleSummer 2007
In an effort to manage a portion of the network I began working on replacing the current methodology for computer imaging. Imaging computers with Ghost in our network environment is very dangerous; the...
View ArticleFall 2007
When I first started the network was a 100mb switched network. The infrastructure consisted of a single vlan that spanned two buildings and was assigned range of approximately 2000 IP addresses. About...
View ArticleWinter 2008
The main thrust of this term was moving away from manual application installation and into a software lifecycle that provided automatic application installation via GPO. We acquired the AdminStudio...
View ArticleSummer 2007
In an effort to manage a portion of the network I began working on replacing the current methodology for computer imaging. Imaging computers with Ghost in our network environment is very dangerous; the...
View ArticleSpring 2007
At the start of this semester nearly 80% of the labs had been imaged using the new RIS server, there were some problems that required some manual intervention right before the semester started, but...
View ArticleSummer 2008
A large number of projects commenced: · ANSR to Proteus migration · Manual to GPO delivered applications · Computer imaging with Windows Deployment Services · Implement VLAN’s · Implement Firewall ·...
View ArticleSummer 2007
In an effort to manage a portion of the network I began working on replacing the current methodology for computer imaging. Imaging computers with Ghost in our network environment is very dangerous; the...
View ArticleSummer 2008
A large number of projects commenced: · ANSR to Proteus migration · Manual to GPO delivered applications · Computer imaging with Windows Deployment Services · Implement VLAN’s · Implement Firewall ·...
View ArticleSpring 2007
At the start of this semester nearly 80% of the labs had been imaged using the new RIS server, there were some problems that required some manual intervention right before the semester started, but...
View ArticleSummer 2007
In an effort to manage a portion of the network I began working on replacing the current methodology for computer imaging. Imaging computers with Ghost in our network environment is very dangerous; the...
View ArticleFall 2007
When I first started the network was a 100mb switched network. The infrastructure consisted of a single vlan that spanned two buildings and was assigned range of approximately 2000 IP addresses. About...
View ArticleSummer 2007
In an effort to manage a portion of the network I began working on replacing the current methodology for computer imaging. Imaging computers with Ghost in our network environment is very dangerous; the...
View ArticleFall 2007
When I first started the network was a 100mb switched network. The infrastructure consisted of a single vlan that spanned two buildings and was assigned range of approximately 2000 IP addresses. About...
View ArticleSummer 2007
In an effort to manage a portion of the network I began working on replacing the current methodology for computer imaging. Imaging computers with Ghost in our network environment is very dangerous; the...
View ArticleFall 2007
When I first started the network was a 100mb switched network. The infrastructure consisted of a single vlan that spanned two buildings and was assigned range of approximately 2000 IP addresses. About...
View ArticleSummer 2007
In an effort to manage a portion of the network I began working on replacing the current methodology for computer imaging. Imaging computers with Ghost in our network environment is very dangerous; the...
View ArticleFall 2007
When I first started the network was a 100mb switched network. The infrastructure consisted of a single vlan that spanned two buildings and was assigned range of approximately 2000 IP addresses. About...
View ArticleSummer 2007
In an effort to manage a portion of the network I began working on replacing the current methodology for computer imaging. Imaging computers with Ghost in our network environment is very dangerous; the...
View ArticleSummer 2008
A large number of projects commenced: · ANSR to Proteus migration · Manual to GPO delivered applications · Computer imaging with Windows Deployment Services · Implement VLAN’s · Implement Firewall ·...
View Article